Experiment No.: 04

Experiment Name:

Prepare wiring installation on a board from the commencement of supply showing energy meter, MCB, control of one lamp, one fan and one socket from one switch board in PVC surface conduit wiring system.

Objective:

  1. To prepare a wiring installation from the commencement of supply.
  2. To connect an energy meter, MCB, one lamp, one fan, and one socket from a single switch board.

Theory:

In this experiment, the electrical supply first passes through the energy meter, which measures energy consumption. The supply then goes to the MCB, which protects the circuit from overload and short circuit. From the MCB, the phase wire is taken to the switch board.

The switch board has separate switches for the lamp, fan, and socket. The fan is connected through a regulator to control its speed. The neutral wire is connected directly to all loads, and the earth wire is connected to the socket and other metal parts for safety.

PVC surface conduit wiring is commonly used because it is neat, easy to install, and protects the wires from damage.

Advantages of PVC Surface Conduit Wiring:

  1. Provides good protection to wires.
  2. Gives a neat appearance.
  3. Easy to repair and maintain.
  4. Suitable for residential and commercial wiring.
  5. Wires can be replaced easily when required.

Apparatus Used:

Sl. No.Tools RequiredQuantity
1Insulated Screwdriver1
2Line Tester1
3Combination Plier1
4Cutting Plier1
5Wire Stripper1
6Hammer1
7Hand saw1
8Measuring Tape1

Wiring Diagram:

Connection Flow:

Supply → Energy Meter → MCB → Switch Board → Lamp / Fan (with Regulator) / Socket

Materials Required:

ESTIMATE

Sl. No.ParticularsSpecificationQuantity
1Energy MeterSingle Phase with Neutral1
2MCBDouble Pole, 16A, 240V1
3Switch Board6″ X 4″ PVC1
4One-Way Switch6A, 240V3
5Fan RegulatorSmooth control type1
6Lamp HolderB22, Pendent Type Holder1
7LED/Lamp9W, 230 V1
8Ceiling FanSweep:1200mm, 230 V1
93-Pin Socket6A, 240V1
10PVC Conduit20mm, PVC3 ft.
11PVC Bends20mm, L, T, I jointAs Required
12PVC Saddle20mmAs Required
13Cable1.0 sq.mm, 1100V grade, PVC insulated, Copper strandedRed & Black
2m each
14Cable0.5 sq.mm, 1100V grade, PVC insulated, Copper strandedGreen 2m
15Junction BoxPVC1

*The material list follows the standard setup used for this practical.

Procedure:

  1. Collect all required tools and materials.
  2. Mark the positions of the energy meter, MCB, switch board, lamp, fan, socket, and conduit.
  3. Cut the PVC conduit to the required length.
  4. Fix the conduit on the board using PVC clips.
  5. Mount the energy meter, MCB, switch board, lamp holder, fan regulator, and socket.
  6. Pull the phase, neutral, and earth wires through the conduit.
  7. Connect the wires according to the wiring diagram.
  8. Tighten all terminals properly.
  9. Check the wiring carefully before giving supply.
  10. Switch ON the MCB and test the lamp, fan, and socket individually.

Observation Table:

LoadTestResult
LampON/OFF by switchOK
FanON/OFF and speed controlled by regulatorOK
SocketSupply available, phase detected on right side pinOK

Precautions:

1. Switch OFF the power before making connections.

2. Use insulated tools only.

3. Tighten all terminals properly.

4. Keep the wiring inside the PVC conduit.

5. Never touch live conductors with bare hands.

6. Check the MCB before energizing the circuit.

7. Ensure the phase is on the right side terminal of the socket.

Viva Questions:

  1. What is the function of an energy meter?
  2. Why is an MCB used?
  3. Why is a fan regulator connected in series with the fan?
  4. What is the standard size of PVC conduit used in this experiment?
  5. Why is the earth wire connected to the socket?
  6. What is the difference between phase and neutral wires?
  7. Why are PVC clips used?
  8. What happens if the MCB trips?
  9. Why should the wiring be checked before giving supply?
  10. Name one advantage of PVC surface conduit wiring.

Conclusion:

By performing this experiment, we learned how to prepare a complete wiring installation from the commencement of supply using an energy meter, MCB, and a single switch board to control one lamp, one fan, and one socket through a PVC surface conduit wiring system.

Leave a Comment

Your email address will not be published. Required fields are marked *

Industrial PLC- Basic⚡ Hands-on Practical Training. Limited Seat- Enroll Now!

Close Welcome Bar
error

Enjoy this blog? Please spread the word :)