Prepare wiring installation on a board from the commencement of supply showing energy meter, MCB control of one lamp ,one fan and one socket from one switch board in PVC surface conduit wiring system.
Experiment No.: 04 Experiment Name: Prepare wiring installation on a board from the commencement of supply showing energy meter, MCB, control of one lamp, one fan and one socket from one switch board in PVC surface conduit wiring system. Objective: Theory: In this experiment, the electrical supply first passes through the energy meter, which measures
